Operation control — well 6/05-A-12, Shift sliding sleeve and log lower completion
Objective
Shift sliding sleeve and log lower completion
Success
SSD confirmed shut + memory log recovered to surface
- Conveyance
- Wireline / e-line
- Working depth
- 2 240 m MD · 1 985 m TVD
- Well status
- Shut-in · 312 bar SITHP · low H2S
Preview — job not yet in operation
This job is still in planning. Complete the readiness gate and “Send to operation” from the planning workspace to start the live run.
Depth track1 500 m
Current depth
1 500m
740 m to target (2 240 m)
Line tension
4.2kN
▲ caution 8 kN · alarm 11 kN
Surface pressure
312bar
▲ caution 360 bar
Running speed
0.0m/min
Holding